title: WMSC link: https://wmsc.gov/oversight/reports/ description: Washington Metrorail Safety Commission safety reports generator: ITSB last-modified: 2024-04-18T13:41:46Z language: en-us errorsto: lucidiot@brainshit.fr title: W-0017 Adoption of WMATA Final Report_E19252_2019_05_21 Train Movement with Doors Open: Orange Line near Dunn Loring-Merrifield Station due to short in master controller – link: https://wmsc.gov/wp-content/uploads/2019/11/W-0017-Adoption-of-WMATA-Final-Report_E19252_2019_05_21-.pdf last-modified: 2019-05-21T00:00:00Z title: W-0014 Adoption of WMATA Final Report_E19226_2019_05_06 C99 Yard Derailment: Hi-Rail vehicle in Alexandria Yard during certification testing – link: https://wmsc.gov/wp-content/uploads/2019/10/W-0014-Adoption-of-WMATA-Final-Report_E19226_2019_05_06-C99-Yard-Derailment.pdf last-modified: 2019-05-06T00:00:00Z title: W-0010 Adoption of WMATA Final Report E19090_2019_02_18 Customer Fatality at Greenbelt Station – link: https://wmsc.gov/wp-content/uploads/2019/07/customerF.pdf last-modified: 2019-02-18T00:00:00Z title: W-0013 Adoption of WMATA Final Report_E18544_2018_12_04 Injured Employee: Splashed with chemical grout solution while repairing water leaks in area of Yellow Line bridge – link: https://wmsc.gov/wp-content/uploads/2019/10/W-0013-Adoption-of-WMATA-Final-Report_E18544_2018_12_04-Injured-Employee.pdf last-modified: 2018-12-04T00:00:00Z title: W-0016 Adoption of WMATA Final Report_E18479_2018_11_01 Employee Injury: Fell from dumpster – link: https://wmsc.gov/wp-content/uploads/2019/11/W-0016-Adoption-of-WMATA-Final-Report_E18479_2018_11_01-Employee-Injury.pdf last-modified: 2018-11-01T00:00:00Z title: W-0012 Adoption of WMATA Final Report_E18442_2018_10_15 Greenbelt Yard Collision with rail tie and torque wrench – link: https://wmsc.gov/wp-content/uploads/2019/10/W-0012-Adoption-of-WMATA-Final-Report_E18442_2018_10_15-Greenbelt-Yard-Collision.pdf last-modified: 2018-10-15T00:00:00Z title: W-0015 Adoption of WMATA Final Report_E18438_2018_10_10 Columbia Heights Fatality: Customer in wheelchair fell backward near top of escalator – link: https://wmsc.gov/wp-content/uploads/2019/11/W-0015-Adoption-of-WMATA-Final-Report_E18438_2018_10_10-Columbia-Heights-Fatality.pdf last-modified: 2018-10-10T00:00:00Z title: W-0004 Adoption of WMATA Final Report E18417_2018_09_24 Red Signal Overrun: Farragut North, identified after switch damage – link: https://wmsc.gov/wp-content/uploads/2019/05/merged4.pdf last-modified: 2018-09-24T00:00:00Z title: W-0011 Adoption of WMATA Final Report E18368_2018_08_25 Train Pull Apart: Silver Line train between McLean and East Falls Church stations due to lack of overhaul procedures, incorrect parts and other issues – link: https://wmsc.gov/wp-content/uploads/2019/07/today.pdf last-modified: 2018-08-25T00:00:00Z title: W-0009 Adoption of WMATA Final Report E18365_2018_08_23 Derailment: Hi-Rail vehicle at Reagan National Airport Station – link: https://wmsc.gov/wp-content/uploads/2019/07/demilition.pdf last-modified: 2018-08-23T00:00:00Z title: W-0001 Adoption of WMATA Final Report E16203_2018_07_18 Collision: Tie crane damaged IDW – link: https://wmsc.gov/wp-content/uploads/2019/10/W-0001-Adoption-of-WMATA-Final-Report-E16203_2016_07_18_Collision_REDACTED.pdf last-modified: 2018-07-18T00:00:00Z title: W-0003 Adoption of WMATA Final Report E18279_2018_07_08 Collision: work vehicle and tamper unit – link: https://wmsc.gov/wp-content/uploads/2019/05/merged3.pdf last-modified: 2018-07-08T00:00:00Z title: W-0008 Adoption of WMATA Final Report E18212_2018_06_02 Serious Injury: Employee injured while welding – link: https://wmsc.gov/wp-content/uploads/2019/07/seriousinjury.pdf last-modified: 2018-06-02T00:00:00Z title: W-0007 Adoption of WMATA Final Report E18159_2018_04_23 Collision with Object: Concrete batch plant unit on maintenance vehicle hit Emergency Trip Station Box D93 – link: https://wmsc.gov/wp-content/uploads/2019/07/collision.pdf last-modified: 2018-04-23T00:00:00Z title: W-0002 Adoption of WMATA Final Report E17386_2017_07_17 RWP Event: Train passed work crew moving faster than 10 mph – link: https://wmsc.gov/wp-content/uploads/2019/05/merged2.pdf last-modified: 2017-07-17T00:00:00Z title: W-0005 Adoption of WMATA Final Report E17277_2017_05_24 RWP Event: Train passed work crew at speed greater than 10 mph  – link: https://wmsc.gov/wp-content/uploads/2019/06/report1.pdf last-modified: 2017-05-24T00:00:00Z title: W-0006 Adoption of WMATA Final Report E17189_2017_03_31 RWP Event: Train passed work crew at speed greater than 10 mph – link: https://wmsc.gov/wp-content/uploads/2019/06/report2.pdf last-modified: 2017-03-31T00:00:00Z